April 2, 2010 -- Day 209 -- Some more progress




Here's our drywell. The drywell was built to help drain the water discharge from our water softener. First, I used the jackhammer to break up some concrete from the walkway, then James and I dug down about 4 feet. James then installed the drain pipes. The next step is to fill it up with small rocks and cover it with soil. The water will drain from the softener into the well and then dissipate into the surrounding soil. It was a lot of digging. A lot.